Project Overview

Egenolf Industrial Group traveled to Clinton, Illinois, to install two 16,000-pound overhead crane girders. Working alongside the Crane Tech crew, Egenolf provided the rigging and industrial contracting expertise required to safely lift, position, align, and secure the girders to form the crane bridge assembly.

Once the girders were properly positioned and connected, the hoist was carefully lifted and installed onto the secured crane bridge. The project required detailed planning, precise execution, and close coordination between both teams to complete the installation safely and efficiently while minimizing disruption to the customer’s operations.

Scope of Work

Egenolf Industrial Group provided rigging and installation support throughout the crane bridge project, including:

  • Crane Girder Rigging: Safely lifted and positioned two 16,000-pound overhead crane girders in preparation for installation.
  • Crane Bridge Assembly: Aligned and secured the two girders to create the crane bridge assembly.
  • Hoist Installation: Lifted and positioned the hoist onto the secured crane bridge following completion of the girder installation.
  • Industrial Contracting Support: Coordinated the installation process with the Crane Tech crew to keep each phase of work moving safely and efficiently.
  • Project & Team Coordination: Maintained communication between project managers, operators, riggers, and technicians throughout each lift and installation phase.

Unique Challenges & Solutions

Installing heavy overhead crane components requires precise positioning and coordination between multiple crews. Egenolf Industrial Group addressed these project requirements through:

  • Heavy Rigging & Controlled Lifts: Each 16,000-pound girder required careful rigging and controlled positioning to safely set the component into place.
  • Precise Alignment: The two girders had to be accurately positioned and secured before the hoist installation could proceed.
  • Crew Coordination: Egenolf worked closely with the Crane Tech crew throughout the project, coordinating responsibilities and communicating during each stage of the installation.
  • Safety-Focused Execution: The team followed numerous safety measures throughout the project to protect personnel, equipment, and the customer’s facility.
  • Minimized Operational Disruption: Detailed planning and coordination helped the crews complete the work efficiently while limiting disruption to the customer’s ongoing operations.
CraneBridge_gallery_photo_1 CraneBridge_gallery_photo_2 CraneBridge_gallery_photo_3 CraneBridge_gallery_photo_4

Results

The two 16,000-pound crane girders were successfully lifted, positioned, and connected to form the overhead crane bridge, followed by hoist installation. Strong communication between Egenolf Industrial Group and the Crane Tech crew helped ensure each phase was completed with a focus on safety, quality, and precision.

The project demonstrates Egenolf Industrial Group’s ability to provide experienced rigging and industrial contracting support for complex equipment installations. Through skilled craftsmanship, detailed planning, and effective project coordination, Egenolf delivers dependable industrial solutions designed around each customer’s unique project requirements.